Beco Steel Expands with Solar Power Project
Summary
Beco Steel announces solar power project in Lahore, saving Rs 201M annually. Completion expected in 4 months.
Kind of disclosure: Expansion/Capex
Read the original filingKey facts
- Solar power project announced
- Rs 201M annual savings
- Electricity generation capacity
- 600,000 KWh per month
- Project location in Lahore
- Completion in 4 months
- Contract with LESCO
- Electricity supply
Beco Steel Limited (BECO) on Nafa
Last price Rs 4.40 · Engineering · You can own BECO shares from your phone.
More BECO announcements
- NoticeTransmission of Quarterly Report for the Period Ended 30-09-2026
- Financial resultBeco Steel Limited reported a decline in both revenue and net profit for the first quarter ended September 30, 2026Filed as: Financial Results for the Quarter Ended 30-09-2026
- NoticeMinutes of Annual General Meeting 2026
- NoticeBoard Meeting
- NoticeTransmission of Annual Report for the FY ended June 30, 2026
- NoticeNotice of Annual General Meeting 2026
Source: Beco Steel Limited's filing with the Pakistan Stock Exchange. The summary and figures on this page are extracted from the filing by software and can contain errors; the filing itself is the record. This page describes the filing. It is not investment advice and Nafa does not recommend any stock. Investing in securities involves risk, including possible loss of principal.